
Originally designed with the Prescient system, this project faced permitting challenges due to floor penetration fire ratings threatening to stall the project. Diversified Builders worked heavily with the general contractor and the code consultants to recommend an alternate structural system incorporating prefabricated load bearing walls and floor systems. DBI was able to build the walls and floor systems off site and hoist them into place greatly contributing to the projects’ success.