
Diversified Builders was approached late in the preconstruction stages for this project when the GC did not have a framer comfortable with the load bearing framing and MSR long-span deck floor systems. We were able to simplify the exterior framing through our years of knowledge and experience, helping keep cost down and improve on schedule. DBI installed all the panels including shear walls and holds town as well as the long span deck and shoring systems.