Diversified Builders was approached with a special challenge for the Longmont High School project. Replace 500 feet of the two-story exterior wall, ready for stucco in two weeks. 22’ Tall walls were built with 3 5/8” structural studs, two layers of 2 ½” Poly-Iso insulation, and Dens Element® Weather Barrier. All of which had to be hoisted under an existing roof canopy. DBI prefabricated the entire assembly in our Wheat Ridge yard and was ready to ship as soon as demolition started.